IMPLEMENTING 5S + POKA-YOKE PROGRAM - REDUCING ASSEMBLY ERRORS AND SEARCH/MOVEMENT LOSSES

Authors

  • Dilnozaxon Boykishiyeva Andijon davlat texnika instituti mustaqil tadqiqotchisi Author

Keywords:

5S; Poka-Yoke; Lean; assembly errors; motion & search losses; FPY; PPM; COPQ; Standard Work; visual control; jig/fixture; spaghetti-diagram; time-motion analysis; VSM; 4M/Ishikawa; 5 Why; PDCA; DMAIC; IATF 16949; automotive industry.

Abstract

This article proposes a methodology for implementing 5S and Poka-Yoke programs in an integrated approach to reduce errors and eliminate (motion & search) losses in assembly lines in the automotive industry.

References

O‘zbekiston Respublikasi Prezidentining “2022–2026-yillarga moʻljallangan Yangi Oʻzbekistonning taraqqiyot strategiyasi toʻgʻrisida”gi Farmoni. T.: 2022-yil 28-yanvar, PF-60-son.

O‘zbekiston Respublikasi Prezidentining “O‘zbekiston — 2030” strategiyasi to‘g‘risidagi Farmoni. T.: 2023-yil 11-sentyabr, PF-158-son.

Ohno, T. (1988). Toyota Production System: Beyond Large-Scale Production. Productivity Press / CRC Press.

Shingo, S. (1986). Zero Quality Control: Source Inspection and the Poka-Yoke System. Productivity Press / CRC Press.

Hirano, H. (1995). 5 Pillars of the Visual Workplace. Productivity Press. Google Книги

Liker, J. K. (2004). The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer. McGraw-Hill.

Veres, C., Marian, L., Moica, S., & Al-Akel, K. (2018). Case study concerning 5S method impact in an automotive company. Procedia Manufacturing, 22, 900–905.

Ojha, R. S., Mishra, P., & Rai, S. (2023). Impact of 5S on productivity and quality in an Indo-Japanese auto-component manufacturing company: An empirical study. E3S Web of Conferences, 430, 01241.

Rhaffora, K. A., et al. (2019). The Adoption of 5S Practice and its Impact on Safety Management. NIOSH Journal (Malaysia).

Mrabti, A., et al. (2023). Digital 5S: a case study of an automotive wiring industry. ITM Web of Conferences.

Saurin, T. A., Ribeiro, J. L. D., & Vidor, G. (2012). A framework for assessing poka-yoke devices. Journal of Manufacturing Systems, 31(3), 358–366.

Trojanowska, J., et al. (2023). Poka-Yoke in Smart Production Systems with Pick-to-Light Implementation to Increase Efficiency. Applied Sciences, 13(21), 11715.

Real, C., & Torres, Y. (2024). Effect of Changes in the Sequence of Assembly Operations on Error Rates: A Case Study from the Car Manufacturing Industry. IEEE Access, 12, 34644–34655.

Published

2025-09-22

How to Cite

IMPLEMENTING 5S + POKA-YOKE PROGRAM - REDUCING ASSEMBLY ERRORS AND SEARCH/MOVEMENT LOSSES. (2025). Eurasian Journal of Academic Research, 5(9), 133-142. https://in-academy.uz/index.php/EJAR/article/view/6593